Design Update for the Reclaimed Water Transmission System from Dirab Plant to Qiddiya

Client Saudi Irrigation Organization
Section Design Update
Project Date 2025
Description

The project aims to study and update the design of the treated water transmission system from Dirab 2 Plant to the Qiddiya Project for irrigation and cooling purposes, and then to the operational reservoirs in Al Muzahimiyah, through updating the hydraulic study and the detailed project drawings